Industry
Oil & Gas
Location
Port Harcourt, Nigeria
Facility Size
60,000 sqm
Deployed Fleet
25 Certified Operators
Contract Scope
Ongoing Contract
β οΈ
The Operational Challenge
High operator turnover and inconsistent safety protocols led to cargo handling slowdowns and elevated damage risks at port quaysides.
Client Context: Maritime Container Terminal
βοΈ
The BAUN Solution
Recruited, vetted, and deployed 25 certified heavy equipment operators trained in international port safety standards and daily pre-shift inspection.
Deployed Fleet: 25 Certified Operators
π Deployed Fleet Technologyβ’Port & Terminal Heavy Equipment
BAUN-RS45 Maritime Container Reachstacker
HIGH-RESOLUTION 360Β° EQUIPMENT LOOP
β‘ High-Resolution Equipment Specs
Rated Load Capacity
45.0 Tons
ποΈββοΈ
Max Elevation Height
5-High Container Stacking
ποΈ
Powertrain System
Heavy Marine Diesel Engine
π
Special Engineering Feature
Telescopic Auto-Locking Container Spreader
βοΈ
Key Equipment Highlights
- β45-Ton Heavy Quayside Lifting Capacity
- β5-High Container Stacking Capability
- βOperated Exclusively by BAUN Certified Crew
Measurable Operational Impact
Verified operational metrics delivered during the contract period.
01
0
Lost Time Safety Incidents
02
100%
Operator Certification Rate
03
+18%
Quayside Handling Speed
Project Deployment Gallery
On-site imagery speaking to equipment, facility layout, and operations for this case study.
π· 2 Verified On-Site Photos

Photo 01
πBlack Nigerian certified port operators wearing safety hardhats and high-vis vests at Port Harcourt docks.

Photo 02
πHeavy forklift and pallet storage operations at the export logistics terminal.


